|
Intended Audience |
Title |
Organization Provider |
Skills |
Skill Points ℠ Total |
Total Views |
||
|---|---|---|---|---|---|---|---|
| HS | Selectively Permeable Membranes | TeachEngineering | Teamwork, Problem Solving, Biology, Applied Science | 12 | 1456 |
408
|
|
| CL | Increase Productivity in Graphic Design | Teacher Ryan | Project Management, Time Management, Graphic Design, Creative Thinking | 1396 | 1787 |
487
|
|
| HS | A Watershed Moment | PBLWorks | Applied Science, Environmental Engineering, Analytical Thinking, Problem Solving, Data interpretation, Visual Communication | 170 | 1181 |
434
|
|
| HS | Magic of Microgrids | PBLWorks | Electrical Systems, Research, Environmental Engineering, Technical Writing, Problem Solving, Analytical Thinking, Presentations | 176 | 1136 |
404
|
|
| HS | Position, Velocity and Acceleration | TeachEngineering | Observation, Research, Physics | 5 | 1454 |
419
|
|
| HS | Pump It! Design-Build-Test Helpful Village Water Pumps | TeachEnginnering | Applied Science, Written Communication, Mathematics, Engineering | 62 | 1462 |
418
|
|
| HS | Balloons | TeachEnginnering | Teamwork, Applied Science, Written Communication, Engineering, Mathematics | 104 | 1447 |
390
|
|
| MS | Waves and Wave Properties | TeachEngineering | Applied Science, Written Communication | 7 | 1557 |
429
|
|
| MS | Asteroids | TeachEngineering | Science, Problem Solving | 2 | 1655 |
410
|
|
| CL | Create Final Copy For Marketing Campaign Through Editorial Process | Teacher Ryan | Adaptability, Teamwork, Graphic Design | 1569 | 1746 |
441
|